Bathroom Makeovers with Before & After Renovation

The first day of installation is the removal of all existing products until you are left with a bare shell. The next stage is generally putting in all the new runs of pipe work (waste pipes and water feeds) needed for the new project. This period of the job lasts roughly 1-2 weeks of a standard 3 week refit, it also includes re plastering ceilings and walls if necessary and any first fix electrics that need to be fitted.

For these types of works to be carried out parts of the floor will be lifted, walls will be chased out and in some cases ceilings will be taken down.

Now your room is in its final stages, although it may not look like it. The preparation is finished and now comes the face of your new bathroom or kithen (the pretty part). The tiling will commence 1.5-2 weeks in and this is when you start to see the room take shape. Tiling will take roughly 1 week depending upon the size and complexity. Once completed and grouted, you are left with a nice clean looking room. All these jobs are carried out by our expert builders in Beaconsfield, Gerrards Cross and Bucks.

The end of your job is now only a few days away, final fixes consist of everything that needs to be put on top of the tiling. Your makeover is complete, from your tired dated room, to your perfect oasis, picked by you, designed and executed by Lakeside. The finished project will reflect the huge difference between before and after renovation. View our recently done projects here.

Christmas Break​

We will be closed from 21st Dec to 2nd January 2024.

For any urgent enquiries please email us: info@lakesidegroup.eu​

renovated by Lakeside Bathrooms
Renovated by Lakeside Group
installed and renovated by Lakeside Group
renovated by Lakeside bathrooms